Lee2006
Mechanical
- Feb 22, 2006
- 28
Hi group,
I have Quality Assurance question involving pressure vessels regarding ISO9001 section 7.3.
I'm struggling understanding the difference between Design Verification and Design Validation in the context of pressure vessel design and manufacture.
Would Design Verification be considered as the production of a calculation report based on code rules or DBA ?
And would Design Validation be considered as a proof test (such as a Hydrotest) ?
Any feedback would be appreciated.
Thanks Lee
I have Quality Assurance question involving pressure vessels regarding ISO9001 section 7.3.
I'm struggling understanding the difference between Design Verification and Design Validation in the context of pressure vessel design and manufacture.
Would Design Verification be considered as the production of a calculation report based on code rules or DBA ?
And would Design Validation be considered as a proof test (such as a Hydrotest) ?
Any feedback would be appreciated.
Thanks Lee