I'm reviewing a bridge formwork design prepared by a supplier in house software which used Eurocode. The used timber beam v-20 2.9m length supported on stringers (wales)then, towers (legs spacing 1.5m). The timber beam span now is 1.5m with double overhangs 0.7m each side.
Moreover, the clear distance between towers is 1.575 (two overhangs 0.7*2 plus 0.175m gab between).
The deflection of timber beam is shown is compared to L/250, but the value didn't include the creep deflection or shear deflection.
I'm asking about:
1. Is it mandatory to calculate the creep deflection using Kdef?
2. When I checked the EN 1995-1-1, I've found a range of allowable deflection [for w(inst)= L/300-L/500], what values should be considered?
3. Is there any recommendations regarding the length of the overhang to the span?
Note: the bridge deck height is 2.3m, span is 40m, and will be poured into two stages, the bot. slab with webs, then the top slab. and the area under reviewing is under the end diaphragm.
Moreover, the clear distance between towers is 1.575 (two overhangs 0.7*2 plus 0.175m gab between).
The deflection of timber beam is shown is compared to L/250, but the value didn't include the creep deflection or shear deflection.
I'm asking about:
1. Is it mandatory to calculate the creep deflection using Kdef?
2. When I checked the EN 1995-1-1, I've found a range of allowable deflection [for w(inst)= L/300-L/500], what values should be considered?
3. Is there any recommendations regarding the length of the overhang to the span?
Note: the bridge deck height is 2.3m, span is 40m, and will be poured into two stages, the bot. slab with webs, then the top slab. and the area under reviewing is under the end diaphragm.