I'm guessing that this has been discussed on here but I can't find anything that addresses my question.
One portion of a project that I am currently working on involves providing a new stair opening in an existing building. The stair design itself was delegated to the contractors sub. This was all clear. However, the stair shop drawings have arrived and do not have a PE stamp. I rejected them and asked for a signed/sealed set of shops to review and it is now becoming an issue. The contractor and sub are saying that they will need extra money to hire a PE.
The most obvious answer in my mind is 'well who designed the stair if not a PE?'. I'm not working with the dream team though and I'd like to have some documentation of standard practice or code requirements to enforce this. Signed stair drawings are not required as part of the building dept. filing in this location, so as far as I know there is no requirement there. It seems like it should be clear that it's implied that the design would have to comply with all local codes and be performed by a PE... how is this usually covered? I don't have it explicitly stated on my drawings.
One portion of a project that I am currently working on involves providing a new stair opening in an existing building. The stair design itself was delegated to the contractors sub. This was all clear. However, the stair shop drawings have arrived and do not have a PE stamp. I rejected them and asked for a signed/sealed set of shops to review and it is now becoming an issue. The contractor and sub are saying that they will need extra money to hire a PE.
The most obvious answer in my mind is 'well who designed the stair if not a PE?'. I'm not working with the dream team though and I'd like to have some documentation of standard practice or code requirements to enforce this. Signed stair drawings are not required as part of the building dept. filing in this location, so as far as I know there is no requirement there. It seems like it should be clear that it's implied that the design would have to comply with all local codes and be performed by a PE... how is this usually covered? I don't have it explicitly stated on my drawings.