Sep 21, 2016 #1 gelsi Chemical Oct 18, 2010 81 0 0 IT Hi, anyone can help me to find methods for wetted and dry PD? i have only these data: tipe CWMS density 160 kg/m3 thick mesh 150 mm free vapour flow area 0,385 m2 flowrate 2000 Act m3/h
Hi, anyone can help me to find methods for wetted and dry PD? i have only these data: tipe CWMS density 160 kg/m3 thick mesh 150 mm free vapour flow area 0,385 m2 flowrate 2000 Act m3/h
Sep 22, 2016 #2 MortenA Petroleum Aug 20, 2001 2,995 0 0 DK I think would would need vendor data Upvote 0 Downvote
Sep 28, 2016 Thread starter #3 gelsi Chemical Oct 18, 2010 81 0 0 IT I found a method for dry calculation, but have to define wire diameter, void fraction (see attached)... http://files.engineering.com/getfile.aspx?folder=c0b7cfb5-589c-4556-a53f-7ac7d23d7d10&file=all.pdf Upvote 0 Downvote
I found a method for dry calculation, but have to define wire diameter, void fraction (see attached)...