SM89
Civil/Environmental
- Jul 2, 2013
- 15
Hi,
I working on demolition of a school building in NYC area. We are structural consultants working along with architect. I am not sure on how the submission of drawing works for this kinda job. Btw we submit our drawings to NYC parks and recreation department. Our job scope is essentially to ripped/demolish a one story school building. Does this mean my drawings should comply with 'BEST squad' checklist of required criteria. Or am i just expected to show the to be demolished portion of the building without getting into the means and methods of demolition sequence. Can anyone who has worked/working in the city share some of your experience.
Thanks
I working on demolition of a school building in NYC area. We are structural consultants working along with architect. I am not sure on how the submission of drawing works for this kinda job. Btw we submit our drawings to NYC parks and recreation department. Our job scope is essentially to ripped/demolish a one story school building. Does this mean my drawings should comply with 'BEST squad' checklist of required criteria. Or am i just expected to show the to be demolished portion of the building without getting into the means and methods of demolition sequence. Can anyone who has worked/working in the city share some of your experience.
Thanks