ccc123
Mechanical
- May 17, 2006
- 38
All,
I have a new project at which we have to install a vertical turbine line shaft pump for deep water well , the design condition for pump is : 450m head and 200m3/hr capacity . The well is drilled before two months , the contractor who driiled the well performed a pumping test at 60m3/hr and from the data of this test they got the value of specific capacity and transmassivity, depending on the test data, the owner of the well did his calculation and correlation to specify the above desing condition. My qustion : Can we depend on the data of the 60 m3/hr pumping test to specify a pump with much higher capacity (200m3/hr) or we have to conduct a pumping test at 200m3/hr and then to check the data if it's ok or not.
I have a new project at which we have to install a vertical turbine line shaft pump for deep water well , the design condition for pump is : 450m head and 200m3/hr capacity . The well is drilled before two months , the contractor who driiled the well performed a pumping test at 60m3/hr and from the data of this test they got the value of specific capacity and transmassivity, depending on the test data, the owner of the well did his calculation and correlation to specify the above desing condition. My qustion : Can we depend on the data of the 60 m3/hr pumping test to specify a pump with much higher capacity (200m3/hr) or we have to conduct a pumping test at 200m3/hr and then to check the data if it's ok or not.