Dear Structural Engineers
A small commercial development at our area will be such that the owner wants to initially build Ground Floor and a 1st floor and later he want to add 2 more floors (Total of 4 floors)This proposed RC building to be used for commercial purposes. The soil condition is ok with sandy gravel soil profile.
The building having only about 50 square meter footprint area. The owner wants to initially build the ground floor columns along the line marked "X" (in plan),and if any future road widening then that to be shifted to lines "Y" & "Y" as per the authorities instructions.
I analyzed the structure and will design according to the requirements. The critical (the maximum length) of column shifting is from “A” to “B”(1.42 m)Pl. refer to the attached sketch.
I need to clarify
1.Is there any special considerations which to be adopt when designing the uncommon shaped beam marked as “ Beam 1” at gridline 1. Other beams (B2) shall be design in the same manner
2.What are the important facts to consider when joining(if required) the column “B “at a future stage & demolish the Column “A” to take the moment due to the future cantilevered load-(about 600 KNm) (The beam will be casted at the initial construction with the required reinforcement to withstand this moment at this proposed cantilevered edge).
A small commercial development at our area will be such that the owner wants to initially build Ground Floor and a 1st floor and later he want to add 2 more floors (Total of 4 floors)This proposed RC building to be used for commercial purposes. The soil condition is ok with sandy gravel soil profile.
The building having only about 50 square meter footprint area. The owner wants to initially build the ground floor columns along the line marked "X" (in plan),and if any future road widening then that to be shifted to lines "Y" & "Y" as per the authorities instructions.
I analyzed the structure and will design according to the requirements. The critical (the maximum length) of column shifting is from “A” to “B”(1.42 m)Pl. refer to the attached sketch.
I need to clarify
1.Is there any special considerations which to be adopt when designing the uncommon shaped beam marked as “ Beam 1” at gridline 1. Other beams (B2) shall be design in the same manner
2.What are the important facts to consider when joining(if required) the column “B “at a future stage & demolish the Column “A” to take the moment due to the future cantilevered load-(about 600 KNm) (The beam will be casted at the initial construction with the required reinforcement to withstand this moment at this proposed cantilevered edge).