chemical13
Chemical
Hi, I am designing amine contactor for H2S removal using MDEA. I am using packed tower with IMTP packing of 1.57inch diameter and the bed diameter is of 3ft. I want to calculate the column height, I need information regarding the retention time of the liqulid in the column. Can anyone help me? Thank you.