g550
Structural
- Dec 7, 2011
- 5
Hi all, Trying to design a mudmat to carry a PLEM (pipe line end manifold) to be located 11m below water surface, soil bearing =15kN/m2, besides the centriod of PLEM wrt that of the mud mat, what other factor do i consider?