the contractor of our project has stated the following:
As Good engineering Practice minimum capacity of the permanent lifting facilities (Overhead crane, Hoist) shall be maximum maintenance weight of the Equipment to be lifted plus 10% margin .
is 10% margin enough to take into the calculations? is there any international code that specifiy the margin?