The required volumetric examnination is specified in PW-11 in Section I. Whenever radiography is required by Section I, it is full (over the full length of L.S or C.S butt welds).
In Section I you have no choice like spot as you find in Section VIII-1 or Section VIII-2.
Nasir
Welding Engineer
DESCON ENGINEERING LIMITED
PAKISTAN