Khalid1970
Electrical
- Aug 17, 2012
- 5
Hi,
For sizing of DC system of 132/11 KV SS, how to compute the 1 minute DC load required for tripping (how many breakers to be assumed tripping simultaneously).
What is the criteria to be followed.
Also, should we add to this the closing coil load or choose the. Highest of the two.
Thanks.
For sizing of DC system of 132/11 KV SS, how to compute the 1 minute DC load required for tripping (how many breakers to be assumed tripping simultaneously).
What is the criteria to be followed.
Also, should we add to this the closing coil load or choose the. Highest of the two.
Thanks.