phuduhudu
Structural
- Apr 19, 2001
- 261
Rather than hijacking the other thread on this I have another hook/ development question. At the top of an external column of a concrete moment frame you get a top bar that needs anchorage into the column. I am taking the standard hook and anchoring that into the outside of the column. Then I take the standard hook from the outside column bar and anchor that up into the joint. But really this is a splice of the outside column steel and the top beam reinf. So presumably the bars need to be spliced. How does a bend influence the splice length? I have also been comparing codes on this issue and it would seem that ACI gives you very small lengths when you use standard hooks but quite large lengths for development whereas the British Standard doesn't give you a great deal of advantage for a hook in terms of anchorage but the general case for anchorage gives you a smaller length than ACI