ars001
Structural
- Aug 21, 2006
- 83
Here's my deal. I basically have a square steel framed building with a metal deck. On two sides of my building(about in the middle of the building) the outside of the building jogs in approximately 2'-0". Therefor my chord forces are broken or my continuous load path is broken. Do I try and provide some sort of flat diagonal plate from one chord member to another? Or, do I justify my diaphragm as rigid and forget about my chord forces?