DE Yakr
Civil/Environmental
- Jun 26, 2020
- 20
Our local jurisdiction dictates that we use a different Ia/S value for a water quality event versus water quantity events.
Is it possible in HydroCAD to have those different runs in the same file or do I have to separate those runs into two files (one for quality and one for quantity)?
THANKS!!
Is it possible in HydroCAD to have those different runs in the same file or do I have to separate those runs into two files (one for quality and one for quantity)?
THANKS!!