rah
Electrical
- Aug 6, 2001
- 3
Does anyone periodically check, via meggering, the insulation integrity of the ct secondary of a differential relay scheme. That is, carefully lift the one grounded point of the ct secondary and megger to ground the secondary wiring to ensure there is no insulation damage that could potentially result in a separate ground path and possible false relay operation.
If so, how often?
If so, how often?