I'm wondering if the sign structure below is worthy of getting a geotechnical report or if presumptive values in the code (US) are good enough.
I guess it's more of a "what will the plan reviewer say" type question, because from a design standpoint I can just make it work with the low bearing/lateral capacities with bigger footings.
I guess it's more of a "what will the plan reviewer say" type question, because from a design standpoint I can just make it work with the low bearing/lateral capacities with bigger footings.