Background: A 25' wide trench has to be constructed 14' deep in a 25' corridor. There is no room to lay back the slopes. There are buildings on shallow foundations adjacent to the trench.
If the design engineer has specified that the contractor use shoring for the construction of the trench---do trench boxes qualify as "shoring"?
If the design engineer has specified that the contractor use shoring for the construction of the trench---do trench boxes qualify as "shoring"?