Bigfaz
Petroleum
- Jun 15, 2014
- 4
New 24" natural gas pipeline in WV, USA.
Inspection had me remove all 600# flanges and weld temporary test heads on prior to hydro of a section of pipeline. Design pressure is 1480psi, material is X65. Hydro pressure was 2400psi due to elevation difference. Inspection said the flanges are tested at manufacture site. I don't agree. I was under the assumption 100% of the pipeline had to be strength tested including the flanges. Please advise, Bigfaz
Inspection had me remove all 600# flanges and weld temporary test heads on prior to hydro of a section of pipeline. Design pressure is 1480psi, material is X65. Hydro pressure was 2400psi due to elevation difference. Inspection said the flanges are tested at manufacture site. I don't agree. I was under the assumption 100% of the pipeline had to be strength tested including the flanges. Please advise, Bigfaz