I work for a company that is installing some new electrical power backup equipment.
I need to make sure it meets the seismic requirements as set forth by the project engineer. (I am in facilities)
These are the guidelines for the building:
A.Seismic-Restraint Loading:
1.SiteClass as Defined in the NCSBC: D.
2.Assigned Seismic Use Group or Building Category as Defined in the NCSBC: I.
a.Component Importance Factor: 1.0.
b.Component Response Modification Factor: 1.25 (Lighting Fixtures), 2.5 (Equipment), and 3.5 (Conduit).
c.Component Amplification Factor: 1.0.
3.Design Spectral Response Acceleration at Short Periods(0.2 Second): 0.346.
4.Design Spectral Response Acceleration at 1.0-Second Period: 0.179.
5.Seismic Design Category: C.
And this is what the equipment manufacturer has provided:
Lateral design seismic force at center of gravity of cabinet is 1.5G.
Vertical design seismic force at center of gravity of cabinet is 0.75G.
Where,Z = 1.0
I = 1.0
K1 = 2.5
K2 = 2.0
K0 = 0.3
How can I prove/disprove the equipment meets the requirements?
Thank you!
I work for a company that is installing some new electrical power backup equipment.
I need to make sure it meets the seismic requirements as set forth by the project engineer. (I am in facilities)
These are the guidelines for the building:
A.Seismic-Restraint Loading:
1.SiteClass as Defined in the NCSBC: D.
2.Assigned Seismic Use Group or Building Category as Defined in the NCSBC: I.
a.Component Importance Factor: 1.0.
b.Component Response Modification Factor: 1.25 (Lighting Fixtures), 2.5 (Equipment), and 3.5 (Conduit).
c.Component Amplification Factor: 1.0.
3.Design Spectral Response Acceleration at Short Periods(0.2 Second): 0.346.
4.Design Spectral Response Acceleration at 1.0-Second Period: 0.179.
5.Seismic Design Category: C.
And this is what the equipment manufacturer has provided:
Lateral design seismic force at center of gravity of cabinet is 1.5G.
Vertical design seismic force at center of gravity of cabinet is 0.75G.
Where,Z = 1.0
I = 1.0
K1 = 2.5
K2 = 2.0
K0 = 0.3
How can I prove/disprove the equipment meets the requirements?
Thank you!