Refer below sketch,
With GTG-1,2,3 running,
CB-A, CB-B, CB-C, CB-D Closed
Bus tie C closed,
For a fault a Switchgear B Bus, will the IS limiter at Switchgear A operate?

With GTG-1,2,3 running,
CB-A, CB-B, CB-C, CB-D Closed
Bus tie C closed,
For a fault a Switchgear B Bus, will the IS limiter at Switchgear A operate?