StructureMan44
Structural
- Dec 10, 2014
- 201
A project has 28 day breaks showing about 10% less than the target. 56-day breaks are coming in well over the 28 day target. The concrete is at about 30 days now at some locations. If the contractor places about 50% of the dead load on the structure will it affect the concrete’s curing or longevity? Is there an ACI section that discusses this?