Hi Everyone,
Question for you. What's more cost effective for a double block and bleed arrangement. Purchasing and installing a dedicated double block and bleed valve, or purchasing the separate components (two block valves and a drain valve) and fabricating the arrangement as part of your piping fabrication.
Any thoughts?
Thanks, Boomer.