svi
Mechanical
- Aug 1, 2006
- 142
thread809-204059
Why is it that there is no reference of a double-wall arrangement in the API STD, even as a reference, committee interpretations so far? Will it not need a qualification for a double-walled arrangement wherein say an 80 m steel tank is enclosed by another steel tank offset radially by approx 3 m. There are aspects that need to be addressed such as the nozzle penetrations through the outside wall. The common bottom plate. The hydro test, operations and maintenance. Moreover having a dyke wall or earthen compacted bund overlayed with concrete offers a more reliable containment. Some thoughts on this is welcome.
Why is it that there is no reference of a double-wall arrangement in the API STD, even as a reference, committee interpretations so far? Will it not need a qualification for a double-walled arrangement wherein say an 80 m steel tank is enclosed by another steel tank offset radially by approx 3 m. There are aspects that need to be addressed such as the nozzle penetrations through the outside wall. The common bottom plate. The hydro test, operations and maintenance. Moreover having a dyke wall or earthen compacted bund overlayed with concrete offers a more reliable containment. Some thoughts on this is welcome.