SgtYui
Structural
- May 22, 2015
- 13
I've got a new concrete ramp that needs to be tied into an existing building slab. The problem is this vehicle produces wheel loads of 100kips on a 3'x3' contact area. Can any reasonable amount of dowels be sufficient to transfer these massive wheel loads into the existing slab? We considered cutting back into the existing slab to create an inclined surface for the connection, have shear friction and some amount of concrete bearing help transfer the loads. We then realized however that the end of the existing slab is heavily reinforced and decided against it.
Any ideas would be greatly appreciated.