skuntz
Chemical
- Mar 16, 2008
- 69
I have a situation where where water will flash through a globe valve to an an open basin downstream. There will be some piping downstream of the valve before emptying into the basin. What (if any) are the issues I need to consider with regards to the downstream piping arrangement?