kcall2
Geotechnical
- Nov 14, 2007
- 20
Storm drain lines located up to 65 feet below existing grades will be supported by consolidated, sedimentary bedrock. Conventional grading methods will be used to install the lines, therefore at locations of manholes, the adjacent soils will consist of granular (SM and SP-SM with gravels) compacted trench backfill. Manhole sections will be installed as the backfill is brought up. Considering the granular nature of the backfill, is it safe to assume that drag down loads on the manhole shaft will be negligible?