nuche1973
Structural
- Apr 29, 2008
- 300
Greetings all,
I put a call into my local contractor, but figured since I'm waiting I'd ask. I am looking at a foundation wall, 12" thick and 13' deep. Next to this is a 3' dia. drilled pier (or pile) that is 8' deep. The distance from the edge of pier to wall face is 12" +/- 2". Taking into account the drilling rig bit and head. It seems to me that this would be difficult to implement. Am I correct?
The loads involved with the pier are small, around 7.5kip combined dead and live. The soil against the foundation is back-fill and not in-situ. As always any insight would be greatly appreciated.
I put a call into my local contractor, but figured since I'm waiting I'd ask. I am looking at a foundation wall, 12" thick and 13' deep. Next to this is a 3' dia. drilled pier (or pile) that is 8' deep. The distance from the edge of pier to wall face is 12" +/- 2". Taking into account the drilling rig bit and head. It seems to me that this would be difficult to implement. Am I correct?
The loads involved with the pier are small, around 7.5kip combined dead and live. The soil against the foundation is back-fill and not in-situ. As always any insight would be greatly appreciated.