Hi all,
I am designing a gas header for a ground flare. Applicable code of design is B31.3 & hydrotest will need to be conducted.
Is there an option in B31.3 to hydrotest the header in undrilled condition and later after hydrotest drill the distribution holes?
Thanks in advance!
I am designing a gas header for a ground flare. Applicable code of design is B31.3 & hydrotest will need to be conducted.
Is there an option in B31.3 to hydrotest the header in undrilled condition and later after hydrotest drill the distribution holes?
Thanks in advance!