Hey everyone,
I keep hearing that within a dry sprinkler system water needs to be delivered to the inspector test valve within 60 seconds. However, I cannot seem to find this referenced in NFPA 13 or NFPA 2. I see some 60 seconds references within NFPA for combined dry and preaction systems but I cannot find any time requirement for just a dry system.
Can someone point me to a reference? Or explain where the 60 seconds comes from?
Thanks,
I keep hearing that within a dry sprinkler system water needs to be delivered to the inspector test valve within 60 seconds. However, I cannot seem to find this referenced in NFPA 13 or NFPA 2. I see some 60 seconds references within NFPA for combined dry and preaction systems but I cannot find any time requirement for just a dry system.