azogr
Structural
- Feb 21, 2007
- 59
I have a situation where the metal building supplier has specified the number and size of anchor bolts required and the frame base plates have been built accordingly. The problem I am having is that I can not get the anchor bolt design to be controlled by a ductile failure of the bolts since the quantity and the size are larger than required for the loads. Normally I would just try to lap the bolt with the vertical bars in the pier and hook the top to develop them properly. Unfortunatly the size requirements of the pier are not going to allow me to easily fit all the hooks and the anchor bolts in the top of the pier. Also the pier is too shallow to extend the anchor bolt any further to get the extra lap length.
Does anyone have any suggestions on how to get this problem solved?
Thanks,
Does anyone have any suggestions on how to get this problem solved?
Thanks,