MALKOBANI
Structural
- Oct 16, 2006
- 21
You are asked to design a four-storey building accounting for a future additional storey. You design the shear walls for five stories using a load reduction factor R=3.5 ( for example). The owner doesn’t know when that additional storey will be added. Obviously, the shear walls are over designed and the expected ductility is less by the over-design ratio. How do you dead with such case?
Thanks
Thanks