tygerdawg
Mechanical
- Mar 31, 2004
- 1,160
A client has received a machine rated at 480Vac 3Ph 60Hz 15KVA max, 3KVA running. They want to install the machine in a temporary location that only has 208Vac 3Ph 60Hz available.
I had to reach 'way back behind the cobwebs and vaguely remember the phrase "step-up transformer", but associated with that phrase was a cold chill of dread.
What can be done? What's the equations behind this decision?
TygerDawg
Blue Technik LLC
Advanced Robotics & Automation Engineering
I had to reach 'way back behind the cobwebs and vaguely remember the phrase "step-up transformer", but associated with that phrase was a cold chill of dread.
What can be done? What's the equations behind this decision?
TygerDawg
Blue Technik LLC
Advanced Robotics & Automation Engineering