Hi:
New user on first project. Version 7.0. We only have the 5 node starter version. I have 5 ponds - 5 hydrographs - 2 inlets and a final pipe. All have the POTENTIAL to cause tailwater conditions on the others.
Is it possible to model this using links? I get the impression from the manual that the links are static without being able to dynamically interact. I need to know if I have to ask the boss to upgrade. Project due next Friday.