structuralnerd
Structural
- Apr 27, 2007
- 107
On our structural general notes page for our typical jobs, we usually put a note that says do not load concrete members before 14 days and before their specified 28 day strength is obtained. I have a contractor asking if he can load it before the 14 days. Is there an ACI document that I can reference to find a good answer for his request? ACI 347? Is there general industry practice for this?