I've designed a composite floor/composite floor beams using a 30N/mm2 charecterisic strenth concrete, but the client wants the floor in use soon after the concrete is placed. If I specified a 35N/mm2 concrete (designated mix RC28/35), how soon after placing the concrete could the floor take the full superimposed load. I've seen a chart which indicates that the required strength would be achieved in approximately 14 days, but not found a formula calculate accurately. Any help would be much appreciated.