Hello to everyone, this is my very first thread - I had a look on the forum but I didn't see anything relevant to my question.
Ok, so I design a battery storage system (800 DC Volts output) that will be connected though a 3-phase inverter to the local low-voltage grid.
My BESS has an IT-earthing system as you would imagine. Is there any restriction that I need to take into account, when connecting my BESS to the local grid which has (most likely) a TN-system?
Any opinion on that would be very helpful, thank you in advance!
Ok, so I design a battery storage system (800 DC Volts output) that will be connected though a 3-phase inverter to the local low-voltage grid.
My BESS has an IT-earthing system as you would imagine. Is there any restriction that I need to take into account, when connecting my BESS to the local grid which has (most likely) a TN-system?
Any opinion on that would be very helpful, thank you in advance!