Pipeline1972
Mechanical
- Apr 22, 2004
- 76
Hello,
I have a water system with a huge NPSHr, compared to the NPSHa. I can't do much about the NPSHa, so i need to somehow reduce my NPSHr. I'm wondering what the effect would be on the NPSHr of adding a second pump in the line, in serie with the first one, somewhere halfway the end.
Any thoughts?
Thanks,
M.
Process - Piping
ing - EiT
I have a water system with a huge NPSHr, compared to the NPSHa. I can't do much about the NPSHa, so i need to somehow reduce my NPSHr. I'm wondering what the effect would be on the NPSHr of adding a second pump in the line, in serie with the first one, somewhere halfway the end.
Any thoughts?
Thanks,
M.
Process - Piping
ing - EiT