brpillai
Petroleum
- Sep 28, 2014
- 36
Dear experts,
In one of our current projects, two 132 KV buried cable is proposed to be running parallel for about 50 meters to a16” buried pipeline with a gap of about 5 to 6 meters. These cables will be crossing the pipeline again after some distance, the cable will be the HT cable will be crossing about a meter below the pipeline.
The pipeline will be cathodically protected with impressed current system. I have read about interference in the case of overhead lines, which are of bare conductor.
I would like to seek your advice on the following:
1 Whether the 132 KV electric cable will have any adverse effect on the pipeline, due to possible electromagnetic inductance.
2. Is there any minimum distance ( for parallel running and for crossing)required for laying the cable from the pipeline.
3. Is there any mitigation/ required?
4. any other precaution to be taken during installation?
5. Is there any literature/ study on this fro refrence?
With warm regards
Bhaskaran R Pillai
Head of Engineering- Pipelines
S/B: + +971 2 494 0700 / D: +971 2 494 0830 / F: +971 2 494 0701
Mob: +971 50 2662185 / Email: brpillai@ccel.ae Web:
CHIYODA CCC ENGINEERING LIMITED (CCEL)
P.O. Box: 6195, Global Tower, Floor No. 8,
Sheikh Zayed The First Street, Abu Dhabi, U.A.E.
In one of our current projects, two 132 KV buried cable is proposed to be running parallel for about 50 meters to a16” buried pipeline with a gap of about 5 to 6 meters. These cables will be crossing the pipeline again after some distance, the cable will be the HT cable will be crossing about a meter below the pipeline.
The pipeline will be cathodically protected with impressed current system. I have read about interference in the case of overhead lines, which are of bare conductor.
I would like to seek your advice on the following:
1 Whether the 132 KV electric cable will have any adverse effect on the pipeline, due to possible electromagnetic inductance.
2. Is there any minimum distance ( for parallel running and for crossing)required for laying the cable from the pipeline.
3. Is there any mitigation/ required?
4. any other precaution to be taken during installation?
5. Is there any literature/ study on this fro refrence?
With warm regards
Bhaskaran R Pillai
Head of Engineering- Pipelines
S/B: + +971 2 494 0700 / D: +971 2 494 0830 / F: +971 2 494 0701
Mob: +971 50 2662185 / Email: brpillai@ccel.ae Web:
CHIYODA CCC ENGINEERING LIMITED (CCEL)
P.O. Box: 6195, Global Tower, Floor No. 8,
Sheikh Zayed The First Street, Abu Dhabi, U.A.E.