Hi,
I have observed this in all the site visits I have done. Top most thing in any train of piping is a PSV. It takes the highest elevation above the pipe rack.
What is the logic? I do not want to get into hydraulics of it, but a basic logical reason to quench my curiosity.
Thanks
I have observed this in all the site visits I have done. Top most thing in any train of piping is a PSV. It takes the highest elevation above the pipe rack.