Galambos
Structural
- Jun 27, 2005
- 231
Im designing an elevator machine room for a 14 story building and i have information from the elevator supplier that shows 35,000lbs reactions for equipment for each of my three elevators. I would ask if this seems reasonable to those of you have dealt with elevators before.
i have three of these loads on a 28ft span with a 12 thick slab, in addition to 125 psf LL. Ive come up with a W36, which seemed to be a red flag for me. thoughts?