We are replacing a bank of elevator cars and their associated controllers, machines, etc. in their entirety.
The elevator machine room is served by several branches off of an existing preaction system which serves a large mechanical room, on the same level as the elevator machine room.
Prior to our work, a study was provided to determine scope and construction costs. In that study, the author claims the elevator machine room must be on its own dedicated sprinkler zone, with its own control valve, flow switch, etc.
I cannot find this requirement anywhere. Is this true?
We are following the 2009 International Codes.
Thanks in advance.
We are replacing a bank of elevator cars and their associated controllers, machines, etc. in their entirety.
The elevator machine room is served by several branches off of an existing preaction system which serves a large mechanical room, on the same level as the elevator machine room.
Prior to our work, a study was provided to determine scope and construction costs. In that study, the author claims the elevator machine room must be on its own dedicated sprinkler zone, with its own control valve, flow switch, etc.
I cannot find this requirement anywhere. Is this true?
We are following the 2009 International Codes.
Thanks in advance.