May 28, 2015 #1 michek Industrial Apr 2, 2013 13 FR Hi everyone, I'm facing to a problem when i calculate hs/R (0.25). It comes out of the table 9.3.4.2, how do you proceede when you get this? ncyl =3 In this case, hs/R =0.25 and ncyl =3 should i check paragraph 9.3.4.b? Thanks for your help
Hi everyone, I'm facing to a problem when i calculate hs/R (0.25). It comes out of the table 9.3.4.2, how do you proceede when you get this? ncyl =3 In this case, hs/R =0.25 and ncyl =3 should i check paragraph 9.3.4.b? Thanks for your help