Alistair_Heaton
Mechanical
- Nov 4, 2018
- 9,781
In europe
The A2L compliance for R32/R290 heatpumps's
What paper work are they expecting?
Just putting together a building control paper pack for a workshop with one.
As the room is 15x6x2.6m, 234m3 volume and will have a 15kg propane bottle in there, 3 kg of R32 is a bit of a mute point in the grand scale of things.
I might add I am well within limits as per
But the installers seem to have zero clue about EN378
Right scrap the propane bottle staying inside
not allowed.