Engineering Cost/ Task Codes

Status
Not open for further replies.

KSTOK

Structural
Oct 26, 2006
5
Need help creating a list of cost or task codes.

Production codes to breakdown a building design.
 
Replies continue below

Recommended for you

engineering design
drafting
site visit
project management
CAD management
research
construction services
engineering changes
CAD changes


 
How detailed do you want to be? For example, in drafting, you could have sub-codes for preliminary drawings, final drawings, revisions, etc.
We have codes for meetings, prepping for meetings, phone calls, email, etc. Allows us to show a client where the charges come from on a T&M job. On a lump sum it's not so imporatnat.
 
Yeah, it is really all about the contract with the client too. Sometime a contract will have a flat fee for one code, and hourly on the other (i.e. site visit).
 