Just a general question. On a concrete structure, is the engineer of record (EOR) commonly responsible for either approving or outlining the required shoring reshoring of multi-story concrete projects?
I know that the load carrying capacity of any floor is primarily known by the engineer and no other. Therefore, it makes sense that the EOR should reply to a request by an owner to write a letter acknowledging that if the concrete strengths are OK and shoring can be removed.
I know that the load carrying capacity of any floor is primarily known by the engineer and no other. Therefore, it makes sense that the EOR should reply to a request by an owner to write a letter acknowledging that if the concrete strengths are OK and shoring can be removed.