Rye1
Civil/Environmental
- Jul 11, 2007
- 108
I'm working in an urban area where after the pedestrian/greenway project is complete, there cannot be any (zero) permanent structures in the channel bottom of a jurisdictional stream. We are currently constructing poured in place swale bridges over jurisdictional "ditches" with maybe a span of 4'. A small swale bridge may take 3-4 pours and our contractors hate them because of the time between pours. We are looking for an off the shelf, small, pre-cast structure that we could install in a day or so. Maybe a three-sided box culvert. Loading needs to be at least H25.
Looking for ideas and advise if anyone has ran into similar situations.
Robert Billings, PE, PH, CFM
Looking for ideas and advise if anyone has ran into similar situations.
Robert Billings, PE, PH, CFM