Sublimenalmssage
Structural
- Jun 14, 2013
- 5
I'm assembling a structure using my subassemblies, basically each part is 4' and eventually adds up to 12'. Is there a way for solidworks to take the 3 different subassemblies add them together and spit out 12' in a build list. Maybe creating an equation to each part in the configuration. I want this to be interchangeable as well so If I have (2) 4' sections and a 2' section I want that template to spit out 10' or 120"