I've been asked to design a steel frame for sway during the erection load case. In the permanent load case the frame will be braced by rc cores. My issue is the builder wants to erect the frame before the cores are built.
My question is what load do I apply to the frames to design bracing members during erection and is there a rule of thumb in terms of the distances between braced bays as my building is 150m long?