MOSTAFA86
Electrical
- Mar 10, 2012
- 22
dear jents
case is as follows; i finished the well's installation and started it up no problems.
i waited until the well stabilized, Pi and Pd are stable and all is good. The client starts taking production readings. Surface rate is 5000 BPD, i look at the curve and find that the operating range is 5700 BPD. i took sensor readings and check the pump curve, the production rate should be 5700 BPD. i looked at the design report and find that formation volume factor is 1.15
Discussion points
should the client base the production on the pump curve?.
Why is the production lower than on curve?
What could be a better solution to increase the production?
What should i consider before doing that?
please advice